Introduction

The intention of this Safe Work Method Statement (SWMS) program is to assist you in complying with requirements of the Victorian OHS Act (2004) for identifying and controlling hazards associated with the work you perform.

There is a 5 stage process to complete the SWMS followed by the final process to print the report. The process allows you to enter information such as:

  • hazards associated with the tasks performed
  • methods to control the hazards
  • estimated costs associated with the control methods (to assist with quoting jobs for your customers)
  • a choice of suitable products that make the tasks easier and safer to perform

Project Details

Name of Principle Contractor:

Client:

Description of Job:

Location:

Project Duration:
From: – to:

Person responsible for ensuring compliance with this SWMS:

Contact Phone Number:

Does your work constitute "High Risk Construction Work"?

Please select from the list below if your work involves any of the following hazards:
Risk of a person falling more than 2 metresInformation about 'Involving the removal or likely disturbance of asbestos' Involving the removal or likely disturbance of asbestosInformation about 'Involving a confined space' Involving a confined spaceInformation about 'Involving a trench or shaft if the excavated depth is more than 1-5 metres' Involving a trench or shaft if the excavated depth is more than 1-5 metresInformation about 'Involving a tunnel' Involving a tunnelInformation about 'On or near chemical, fuel or refrigerant lines' On or near chemical, fuel or refrigerant linesInformation about 'On or near energised electrical installations or services' On or near energised electrical installations or servicesInformation about 'In an area that may have a contaminated or flammable atmosphere' In an area that may have a contaminated or flammable atmosphereInformation about 'On or adjacent to roadways or railways used by road or rail traffic' On or adjacent to roadways or railways used by road or rail trafficInformation about 'At workplaces where there is any movement of powered mobile plant' At workplaces where there is any movement of powered mobile plantInformation about 'In, over or adjacent to water or other liquids where there is a risk of drowning' In, over or adjacent to water or other liquids where there is a risk of drowning

Additional Work Activities (if applicable)?

Unload truck
Description:

Moving furniture
Description:

Setting up / accessing work areas / clearing work area
Description:

Setting up plant and equipment
Description:


Hand sanding
Description:

Mechanical sanding
Description:

Mixing paint and handling chemicals
Description:

Filling and patching, using natural and synthetic fillers
Description:

Hand washing and cleaning surfacesurface preparation using heat (heat gun/flame) Chemical Paint removal
Description:

High Pressure washing
Description:

Abrasive Blasting
Description:


Hand (painting) brushing
Description:

Rolling or pad paint application
Description:

Spray Painting
Description:


Loading equipment into and onto vehicles
Description:

Moving furniture
Description:

Dismantling plant and equipment
Description:

Moving and positioning elevated work platforms
Description:

Cleaning painting equipment
Description:

Finish the SWMS

You have now completed all of the required information to produce the SWMS.

Your obligations under the Victorian OHS Act 2004 also require you to monitor the work you perform and to try to reduce any other hazards that may result from this work. We have provided some blank spaces for you to enter any additional hazards identified, if needed, in the printout of this SWMS.

Optional Information

Estimated cost of OH&S related equipment:

Special permits required:

Email Address to send completed form to: